Browser demo · v0.5.4
Forest coverage planner
Estimate the percentage left to paint and the time required at a rate you measure. This tool does not read your save or locate hidden patches.
Estimated minutes remaining—
- Coverage remaining (% points)
- —
How the calculation works
Remaining = 100 − coverage. Minutes = remaining ÷ measured percentage points per minute. Growth is rarely constant near the last gaps, so use this as a planning estimate, not a completion promise.